Research graph
References from Multi-mode resource-constrained project scheduling problem considering man-hour budget for automotive manufacturing in Industry 5.0. Local targets link to admitted publications; unresolved targets remain external evidence.
Autonomous learning of digital twins for intelligent extrusion optimisation in MEX
10.1016/j.jmapro.2025.04.006 · 2025 · External reference
Enhancing manufacturing process accuracy: A multidisciplinary approach integrating computer vision, machine learning, and control systems
10.1016/j.jmapro.2025.03.112 · 2025 · External reference
Towards Trustworthy AI in Industry 5.0: Ante-hoc Interpretability with Deep Learning
10.1016/j.cie.2026.111805 · 2026 · External reference
A predictive–reactive approach for the sequencing of assembly operations in an automated assembly line
10.1016/j.rcim.2021.102201 · 2022 · External reference
Review on R&D task integrated management of intelligent manufacturing equipment
10.1007/s00521-022-07023-9 · 2022 · External reference
A survey on blockchain for information systems management and security
10.1016/j.ipm.2020.102397 · 2021 · External reference
The integrated process planning and scheduling of flexible job-shop-type remanufacturing systems using improved artificial bee colony algorithm
10.1007/s10845-022-01969-2 · 2023 · External reference
Modeling and optimization of parallel disassembly line balancing problem with parallel workstations
10.1109/tii.2023.3241583 · 2023 · External reference
Federated Learning-Empowered Smart Manufacturing and Product Lifecycle Management: A Review
10.1016/j.aei.2025.103179 · 2025 · External reference
Human-centric Artificial Intelligence Towards Industry 5.0: Retrospect and Prospect
2025 · External reference
Obstacle Avoidance and Near Time-Optimal Trajectory Planning of a Robotic Manipulator Based on an Improved Whale Optimisation Algorithm
10.1007/s13369-022-06926-y · 2022 · External reference
Optimized scheduling of resource-constraints in projects for smart construction
10.1016/j.ipm.2022.103005 · 2022 · External reference
APPINT algorithm for decision-making based on information integration in the assembly of personalized products
2024 · External reference
Optimization of machine configuration and scheduling in the hybrid flow shop using a linear programming-driven evolutionary approach
10.1016/j.rcim.2025.103029 · 2025 · External reference
Planning optimised multi-tasking operations under the capability for parallel machining
10.1016/j.jmsy.2021.10.009 · 2021 · External reference
Multi-perspective collaborative scheduling using extended genetic algorithm with interval-valued intuitionistic fuzzy entropy weight method
10.1016/j.jmsy.2019.10.002 · 2019 · External reference
Product design-time optimization using a hybrid meta-heuristic algorithm
10.1016/j.cie.2021.107177 · 2021 · External reference
Task allocation optimization model in mechanical product development based on Bayesian network and ant colony algorithm
10.1007/s11227-021-03831-3 · 2021 · External reference
Task allocation of heterogeneous robots under temporal logic specifications with inter-task constraints and variable capabilities
10.1109/tase.2025.3558977 · 2025 · External reference
Optimization of task allocation for resource-constrained swarm robots
10.1109/tase.2024.3389013 · 2025 · External reference
Multi-objective evolutionary algorithm with machine learning and local search for an energy-efficient disassembly line balancing problem in remanufacturing
10.1115/1.4056573 · 2023 · External reference
Exact and heuristic methods for a workload allocation problem with chain precedence constraints
10.1016/j.ejor.2022.12.035 · 2023 · External reference
A Multi-Objective Bi-Population Evolutionary Algorithm for Human-Robot Collaborative Disassembly Sequence Planning with Interval Type-2 Fuzzy Modelling
2025 · External reference
A Q-learning-based improved multi-objective genetic algorithm for solving distributed heterogeneous assembly flexible job shop scheduling problems with transfers
10.1016/j.jmsy.2025.02.002 · 2025 · External reference
A semantic-level component-based scheduling method for customized manufacturing
10.1016/j.rcim.2021.102144 · 2021 · External reference
A novel knowledge graph-based optimization approach for resource allocation in discrete manufacturing workshops
10.1016/j.rcim.2021.102160 · 2021 · External reference
Autonomous resource allocation of smart workshop for cloud machining orders
10.1017/s089006042000044x · 2021 · External reference
Hidden Markov model-based autonomous manufacturing task orchestration in smart shop floors
10.1016/j.rcim.2019.101845 · 2020 · External reference
Base part centered assembly task precedence generation
10.1007/s00170-019-04864-y · 2020 · External reference
EMM: Extended matching market based scheduling for big data platform hadoop
10.1007/s11042-021-11283-3 · 2022 · External reference
Investigation on distributed rescheduling with cutting tool maintenance based on NSGA-III in large-scale panel furniture intelligent manufacturing
10.1016/j.jmapro.2024.01.016 · 2024 · External reference
Joint optimization of the high-end equipment development task process and resource allocation
10.1007/s11047-018-9722-x · 2020 · External reference
A bi-objective salp swarm algorithm with sine cosine operator for resource constrained multi-manned disassembly line balancing problem
10.1016/j.asoc.2022.109759 · 2022 · External reference
Meta-knowledge triple driven multi-modal knowledge graph construction method and application in production line control with Gantt charts
10.1016/j.jmsy.2025.03.002 · 2025 · External reference
A phased robotic assembly policy based on a PL-LSTM-SAC algorithm
10.1016/j.jmsy.2024.12.008 · 2025 · External reference
An Efficient Multi-Objective Evolutionary Algorithm for Solving a Collaborative Disassembly Sequence Planning Problem Considering Human–robot Collaboration
2025 · External reference
Adaptive variable neighborhood search solution methods for the fleet size and mix pollution location-inventory-routing problem
10.1016/j.eswa.2020.113444 · 2020 · External reference
An efficient adaptive large neighborhood search algorithm based on heuristics and reformulations for the generalized quadratic assignment problem
10.1016/j.engappai.2023.106802 · 2023 · External reference
A modified adaptive large neighborhood search algorithm for serial-batching machines scheduling considering changeover time and rate-modifying activities
10.1016/j.engappai.2024.109865 · 2025 · External reference
Multi-objective Heterogeneous Interactive Human-Robot Collaborative Disassembly Line Balancing with Partial Destructive Mode in Type-2 Fuzzy Environment
2025 · External reference
Joint optimization of production scheduling and worker allocation under a resource dedication policy in aircraft assembly lines
10.1016/j.rcim.2025.103047 · 2025 · External reference
An End-to-end Deep Reinforcement Learning Method for Dynamic Flexible Job Shop Scheduling Problem Considering Multi-Skilled Worker Constraints
2026 · External reference
Dynamic reconfiguration optimization of intelligent manufacturing system with human-robot collaboration based on digital twin
10.1016/j.jmsy.2022.09.021 · 2022 · External reference
PSPLIB-A project scheduling problem library
10.1016/s0377-2217(96)00170-1 · 1997 · External reference
Collaborative order picking with multiple pickers and robots: Integrated approach for order batching, sequencing and picker-robot routing
10.1016/j.ijpe.2022.108634 · 2022 · External reference
A chance-constraint programming approach for a disassembly line balancing problem under uncertainty
10.1016/j.jmsy.2024.03.014 · 2024 · External reference