Research graph
References from Assembly scheduling for an integrated two-robot workcell. Local targets link to admitted publications; unresolved targets remain external evidence.
The scheduling-sequence problem
10.1287/opre.7.5.621 · 1957 · External reference
Outline of an algorithm for integer solutions to linear-programs
10.1090/s0002-9904-1958-10224-4 · 1958 · External reference
The multiple-robot assembly plan problem
10.1007/bf01258212 · 1993 · External reference
Unresolved reference
1982 · External reference
Machine sequencing via disjunctive graphs: an implicit enumeration algorithm
10.1287/opre.17.6.941 · 1969 · External reference
Scheduling the general job shop
10.1287/mnsc.31.5.594 · 1985 · External reference
Connectionist ideas and algorithms
10.1145/92755.92764 · 1990 · External reference
Unresolved reference
1989 · External reference
An integer linear-programming model for machine scheduling
10.1002/nav.3800060205 · 1959 · External reference
Tabu search techniques
10.1007/bf01720782 · 1989 · External reference
Job shop scheduling with genetic algorithms
1985 · External reference
Using genetic algorithms to schedule flow shop releases
1989 · External reference
Collision-free motion planning of two robots
10.1109/tsmc.1987.289330 · 1987 · External reference
A survey of constraint based scheduling systems using an artificial intelligence approach
10.1016/0954-1810(91)90001-5 · 1991 · External reference
Unresolved reference
1990 · External reference
“Neural” computation of secessions in optimization problems
10.1007/bf00339943 · 1985 · External reference
Unresolved reference
1964 · External reference
Unresolved reference
1991 · External reference
Resurrecting the future of operation research
10.1057/jors.1979.41 · 1979 · External reference
Intelligent scheduling in manufacturing through neural network and expert systems
1990 · External reference
Constraint propagation in planning and scheduling
1991 · External reference
Constraint satisfaction algorithms
10.1111/j.1467-8640.1989.tb00328.x · 1989 · External reference
A two-robot printed circuit board assembly system
10.1080/09511929508944626 · 1995 · External reference
Job shop scheduling by science annealing
1988 · External reference