Contact and support
Need help, have a question, or want to contact the ResearchHub team?
© 2026 ResearchHub. Built for responsible scholarly connection.
Research graph
References from Tunnelling projects in Southern Africa. Local targets link to admitted publications; unresolved targets remain external evidence.
Unresolved reference
External reference
Unresolved reference
1970 · External reference
83 kilometers of risks and unknowns. 1975
1975 · External reference
Orange-Fish Tunnel: Longest in the world
1969 · External reference
The Orange-Fish Tunnel: A comparative study of methods and equipment
1970 · External reference
Orange Fish Tunnel—The Longest Water Tunnel in the World
1983 · External reference
Hydraulic roughness change in the Orange-Fish Tunnel
1991 · External reference
Hydraulic roughness increase and decline of the capacity of large diameter water tunnels
1992 · External reference
The use of drilling and mucking equipment on the Jonkershoek tunnel project
1983 · External reference
35 km tunnel system for Cape Water Scheme
1979 · External reference
Tunnel Lining Techniques on the Jonkershoek Scheme
1979 · External reference
Inanda Wiggins Aqueduct — Phase 2
1991 · External reference
Excavation of the Clermont Tunnel Aspects of control in tunnelling projects
1993 · External reference
Construction of the Emolweni Tunnel
1994 · External reference
Lesotho Highlands Water Project — Project Management
1997 · External reference
Lesotho Highlands Water Project-Design and Construction of Katse Dam
1997 · External reference
Lesotho Highlands Water Project—Design and Construction of the Transfer Tunnel
1997 · External reference
Lesotho Highlands Water Project: Design and layout of underground works for ‘Muela Hydropower Project
1994 · External reference
Lesotho Highlands Water Project—Design of the ‘Muela Hydropower Station
1997 · External reference
Lesotho Highlands Water Project — Design and Construction of the Delivery Tunnel
1997 · External reference
Steenbras Pumped Storage Scheme: Tunnelling in rocks of the Table Mountain Group
1983 · External reference
Steeenbras Pumped Storage Scheme: Fissure and consolidation grouting in rocks of the Table Mountain Group
1983 · External reference
The Drakensberg Project — Water and power for South Africa
1982 · External reference
The Drakensberg Pumped Storage Scheme: Description of scheme and principal data
1982 · External reference
Rock engineering investigation and design studies for the Drakensberg Pumped Storage Scheme
1982 · External reference
Construction of the main civil works of the Drakensberg Pumped Storage Scheme
1982 · External reference
Concrete waterway linings for the Drakensberg Pumped Storage Scheme
1982 · External reference
The Palmiet Pumped Storage Scheme wins the Institution's top award for 1987
1988 · External reference
Underground works play avital role in construction at Palmiet
1986 · External reference
History of the Du Toitskloof Pass and Tunnel
1988 · External reference
Planning and design considerations for the Du Toitskloof Highway Tunnel
1988 · External reference
Du Toitskloof Tunnel: a geotechnical overview
1988 · External reference
Excavation through saturated decomposed granite by multiple headings with vacuum drainage
1988 · External reference
The main tunnel contract
1988 · External reference
Hex River Tunnel scheme setting a new SA record
1986 · External reference
The Hex River Tunnel Case
1990 · External reference
Expansion of the carrying capacity of the Richards Bay railway line: project development
1985 · External reference
Use of tunnel deformation monitoring for excavation control in weak bedded rock — Isangoyana Rail Tunnel, Zululand
1988 · External reference
Mile 58 Tunnel: Vryheid to Richards Bay Coal Line
1983 · External reference
Proposed railway tunnel in the Pietermaritzburg Shale formation in Kwa Zulu
1983 · External reference
The Mqwabe to Sikame deviation with special reference to its tunnels
1985 · External reference
Coal line improvement projects: Special aspects undertaken by Vryheid Construction
1985 · External reference
Tunnelling in rock using a full face machine in Durban
1983 · External reference
Midmar Tunnel Construction Lessons
1996 · External reference
A new era in dawning — privately financed tunnelling projects
1996 · External reference
Tunnelling into the future: The role of water resources development
1996 · External reference
Tunnelling — a client's perspective
1996 · External reference
Planning the underground works for Johannesburg's Masstran
1985 · External reference