Contact and support
Need help, have a question, or want to contact the ResearchHub team?
© 2026 ResearchHub. Built for responsible scholarly connection.
Research graph
References from Evaluating Service Risk in Railway Capacity Utilization Using Expected Recovery Time. Local targets link to admitted publications; unresolved targets remain external evidence.
10.1016/j.tre.2007.04.001
10.1016/j.tre.2007.04.001 · External reference
Optimizing scheduled times, allowing for behavioural response
10.1016/s0191-2615(97)00039-8 · 1998 · External reference
Testing schedule performance and reliability for train stations
10.1057/palgrave.jors.2600939 · 2000 · External reference
Recoverable robust timetabling for single delay: Complexity and polynomial algorithms for special cases
10.1007/s10878-009-9247-4 · 2009 · External reference
Stability evaluation of a railway timetable at station level
10.1016/j.ejor.2007.06.062 · 2009 · External reference
Analysing stability and investments in railway networks using advanced evolutionary algorithms
10.1111/j.1475-3995.2004.00465.x · 2004 · External reference
Railway timetable stability analysis using max-plus system theory
10.1016/j.trb.2006.02.003 · 2007 · External reference
10.1080/03081069508717561
10.1080/03081069508717561 · External reference
10.1287/trsc.32.4.346
10.1287/trsc.32.4.346 · External reference
A solvable queuing network model for railway networks and its validation and application for Netherlands
10.1016/s0377-2217(01)00269-7 · 2002 · External reference
Unresolved reference
External reference
Development and application of rail transit capacity models in Taiwan
10.3141/2216-14 · 2011 · External reference
Using simulated annealing in a bottleneck optimization model at railway stations
2012 · External reference
Public transport travel-time variability definitions and monitoring
2015 · External reference
10.3141/2197-03
10.3141/2197-03 · External reference
10.1061/(asce)te.1943-5436.0000388
10.1061/(asce)te.1943-5436.0000388 · External reference
Evaluation of railway networks with single track operation using the UIC 406 capacity method
10.1007/s11067-008-9090-7 · 2009 · External reference
10.1061/(asce)te.1943-5436.0000461
10.1061/(asce)te.1943-5436.0000461 · External reference
10.1016/j.ejor.2004.10.010
10.1016/j.ejor.2004.10.010 · External reference
10.1016/j.aap.2014.07.029
10.1016/j.aap.2014.07.029 · External reference
10.1016/j.trb.2006.02.004
10.1016/j.trb.2006.02.004 · External reference
Risk-based transit schedule design for a fixed route from the view of equity
10.1061/(asce)te.1943-5436.0000594 · 2013 · External reference