Research graph
References from A multi-criteria approach to risk assessment and mitigation in UAE oil and gas construction projects: a hybrid Delphi–Fuzzy AHP framework. Local targets link to admitted publications; unresolved targets remain external evidence.
Identification of health and safety prequalification criteria for contractor selection in construction projects: a systematic review
10.3390/en14217244 · 2021 · External reference
Enhancing risk-based engineering design: a hybrid fuzzy failure analysis with empirical validation
10.3389/fmech.2025.1732819 · 2025 · External reference
Unresolved reference
2024 · External reference
Impact of industry 5.0 on the construction industry (construction 5.0): systematic literature review and bibliometric analysis
10.3390/buildings15091491 · 2025 · External reference
Proposed risk management decision support methodology for oil and gas construction projects. The 10th International Conference on Engineering, Project, and Production Management
2020 · External reference
Modeling the effects of construction risks on the performance of oil and gas projects in developing countries: project managers’ perspective
2022 · External reference
Recent trends and challenges in Project management of oil and gas projects: a systematic review
10.55699/ijogr.2025.0502.1089 · 2025 · External reference
Impact of sustainable safety climate on poor compliance with personal protective equipment in oil and gas construction projects: quantitative analysis and best sustainable practices
10.1016/j.eiar.2025.108211 · 2026 · External reference
Construction risk management in Iraq during the COVID-19 pandemic: challenges to implementation and efficacy of practices
10.1061/jcemd4.coeng-13099 · 2023 · External reference
Unresolved reference
2023 · External reference
Structural equation modeling and Fuzzy set theory: advancing risk assessment in oil and gas construction projects
10.1016/j.eiar.2024.107622 · External reference
Implementation of a combined fuzzy controller model to enhance risk assessment in oil and gas construction projects
10.1109/access.2024.3399129 · External reference
Review of studies on risk factors in critical infrastructure projects from 2011 to 2023
10.1108/sasbe-09-2023-0285 · 2025 · External reference
Analyzing barriers to sustainable enterprise risk management in the construction sector: a Delphi method and interpretive structural modeling approach
10.3390/su17219498 · 2025 · External reference
Sustainable enterprise risk management in construction: insights from the United Arab Emirates
10.1016/j.susoc.2026.02.002 · 2026 · External reference
A framework for enhancing safety planning in oil and gas construction projects
10.1016/j.asej.2024.103257 · 2025 · External reference
Risk factors that lead to time and cost overruns of building projects in Saudi Arabia
10.3390/buildings12070902 · 2022 · External reference
On a shortcoming of Saaty’s method of analytic hierarchies
10.1016/0305-0483(83)90047-6 · 1983 · External reference
Cause and impact analysis of cost and schedule overruns in subsea oil and gas projects: a supplier’s perspective
2017 · External reference
Time and cost overrun in the Saudi Arabian oil and gas construction industry
10.3390/buildings9020041 · 2019 · External reference
Fuzzy hierarchical analysis
10.1016/0165-0114(85)90090-9 · 1985 · External reference
Choosing project risk management techniques. A theoretical framework
10.1080/13669877.2014.896398 · 2015 · External reference
Applications of the extent analysis method on fuzzy AHP
10.1016/0377-2217(95)00300-2 · 1996 · External reference
Construction partnering process and associated critical success factors: quantitative investigation
10.1061/(asce)0742-597x(2002)18:4(194) · 2002 · External reference
Megaprojects from the lens of business and management studies: a systematic literature review
10.1002/pa.2937 · 2024 · External reference
Unresolved reference
2018 · External reference
Review of application of analytic hierarchy process (AHP) in construction
10.1080/15623599.2018.1452098 · 2019 · External reference
Adapting scenario planning to create an expectation for surprises: going beyond probability and plausibility in risk assessment
10.1111/risa.70112 · 2025 · External reference
Sustainable procurement for improving project performance for oil and gas projects
10.1504/ijpm.2020.10027350 · 2020 · External reference
Company and project evaluation model for privately promoted infrastructure projects
10.1061/(asce)0733-9364(1996)122:1(71) · 1996 · External reference
A decision-support tool for risk and complexity assessment and visualization in construction projects
10.1016/j.compind.2022.103694 · 2002 · External reference
Integrating enterprise risk management to address AI‐related risks in healthcare: strategies for effective risk mitigation and implementation
10.1002/jhrm.70000 · 2025 · External reference
How geopolitical risk drives exchange rate and oil prices? A wavelet-based analysis
10.1080/15567249.2021.1965262 · 2021 · External reference
Regulatory policy choice in post‐reform contexts: the case of industrial safety regulation in Mexico's oil and gas industry
10.1111/rego.12548 · 2024 · External reference
Developing a sustainability-driven risk management framework for green building projects: a literature review
10.1016/j.jclepro.2025.145891 · 2025 · External reference
Comparison of convenience sampling and purposive sampling
10.11648/j.ajtas.20160501.11 · 2016 · External reference
Analysis of Delphi study 7-point linear scale data by parametric methods: use of the mean and standard deviation
10.1177/20597991231179393 · 2023 · External reference
How many interviews are enough? Do qualitative interviews in building energy consumption research produce reliable knowledge?
10.1016/j.jobe.2014.12.001 · 2015 · External reference
Exploring fuzzy AHP approaches for quality management control practices in public building construction projects
10.1080/23311916.2024.2326765 · 2024 · External reference
Using Delphi technique to build consensus in practice
10.69864/ijbsam.9-2.106 · 2014 · External reference
The analytic hierarchy process: applications and studies
10.1007/978-3-642-50244-6 · 1989 · External reference
Proactive risk management in smart manufacturing: a comprehensive approach to risk assessment and mitigation
10.1201/9781032694375-8 · 2024 · External reference
The Delphi technique: a method for testing complex and multifaceted topics
10.1108/17538370910930545 · 2009 · External reference
Research guidelines for the Delphi survey technique
10.1046/j.1365-2648.2000.t01-1-01567.x · 2000 · External reference
Sample sizes for saturation in qualitative research: a systematic review of empirical tests
10.1016/j.socscimed.2021.114523 · 2022 · External reference
Unresolved reference
2005 · External reference
Toward a framework for systemic multi-hazard and multi-risk assessment and management
10.1016/j.isci.2023.106736 · 2023 · External reference
How do oil and gas workers cope with a changing economy? Economic vulnerability among rural Canadians in the oil and gas sector
10.1016/j.erss.2025.104146 · 2025 · External reference
Research pearls: expert consensus based evidence using the Delphi method
10.1016/j.arthro.2018.10.004 · 2018 · External reference
Unresolved reference
2024 · External reference
Sustainable safety practices and hazard management in the oil and gas industry: an HSE perspective
10.3389/fpubh.2025.1611106 · 2025 · External reference
Evaluation of safety engineering system in oil and gas construction projects in UAE
10.21660/2017.29.97136 · 2017 · External reference
Theoretical review on critical risk factors in oil and gas construction projects in Yemen
10.1108/ecam-03-2019-0123 · 2021 · External reference
Risk management assessment in oil and gas construction projects using structural equation modeling (PLS-SEM)
10.3390/gases2020003 · 2022 · External reference
Effective risk management as a mediator to enhance the success of construction projects. International conference on emerging technologies and intelligent systems
2022 · External reference
Structural modelling of internal risk factors for oil and gas construction projects
10.1108/ijesm-11-2019-0022 · External reference
Assessment of the effect of external risk factors on the success of an oil and gas construction project
10.1108/ecam-10-2019-0573 · External reference
Identifying and prioritizing delay factors in Iran’s oil construction projects
10.1108/ijesm-04-2020-0006 · 2021 · External reference
Risk management in the production phase of oil and gas projects: evaluating risk responses and their impact on safety and damage reduction
10.1007/s44290-025-00250-8 · 2025 · External reference
Probabilistic tunnel collapse risk evaluation model using analytical hierarchy process (AHP) and Delphi survey technique
10.1016/j.tust.2021.104262 · 2022 · External reference
Contextual evaluation of risk identification techniques for construction projects: comparative insights and a decision-support model
10.3390/buildings15203806 · 2025 · External reference
A state-of the-art survey & testbed of fuzzy AHP (FAHP) applications
10.1016/j.eswa.2016.08.064 · 2016 · External reference
Establishing risk matrix standard criteria for use in the continuous risk management process
10.1016/j.jsse.2023.05.001 · 2023 · External reference
Harnessing AI for project risk management: a paradigm shift
10.1007/978-3-031-51719-8_16 · 2024 · External reference
How does contractual governance affect construction project performance? The mediating role of the contractor’s behavior
10.1080/13467581.2024.2396606 · 2025 · External reference
Determination and quantification of content validity
10.1097/00006199-198611000-00017 · 1986 · External reference
Framework for preliminary risk assessment of brownfield sites
10.1016/j.scitotenv.2021.151069 · 2022 · External reference
Factors and method of preventing construction site incidents
10.3390/engproc2025091018 · 2025 · External reference
Identification of project cultural factors affecting the performance of UAE construction projects
10.1016/j.aej.2023.11.064 · 2024 · External reference
Impact of national culture on the management practices of construction projects in the United Arab Emirates
10.1061/(asce)me.1943-5479.0000265 · 2015 · External reference
The Delphi technique as a tool for quality research in the built environment
10.1201/9780429243226-14 · 2022 · External reference
Managing large-scale capital projects in oil and gas: Cross-functional engineering leadership, cost performance and execution excellence
10.30574/gjeta.2024.21.3.0233 · 2024 · External reference
The PRISMA 2020 statement: an updated guideline for reporting systematic reviews
10.1136/bmj.n71 · 2021 · External reference
Expert validation of a teamwork assessment rubric: a modified Delphi study
10.1016/j.nedt.2015.07.023 · 2016 · External reference
Unresolved reference
2009 · External reference
Decoding stakeholder priorities of safety culture preferences in the oil and gas industry
10.1038/s41598-024-71294-6 · 2024 · External reference
Unresolved reference
2012 · External reference
Unresolved reference
1980 · External reference
Risk prioritization in Libyan construction projects using FAHP: political and financial drivers in a fragile environment
10.1007/s44290-026-00419-9 · 2026 · External reference
Financial Risk Management in the Construction Projects
10.1016/j.jksues.2022.05.001 · 2022 · External reference
An integrated delphi and fuzzy ahp model for contractor selection: a case of addis ababa design and construction works bureau
10.1080/23311916.2024.2357724 · 2024 · External reference
Examining the impact of risk management practices on sustainable project performance in the construction industry: the role of stakeholder engagement
10.3389/fbuil.2025.1575827 · 2025 · External reference
Research on the influence of risk on construction project performance: a systematic review
10.3390/su14116412 · 2022 · External reference
Fuzzy logic approach for controlling uncertain and nonlinear systems: a comprehensive review of applications and advances
10.1080/21642583.2024.2394429 · 2024 · External reference
Artificial intelligence in risk management within the realm of construction projects: a bibliometric analysis and systematic literature review
10.1016/j.jik.2025.100711 · External reference
Artificial intelligence in construction risk management: a decade of developments, challenges, and integration pathways
10.1080/13669877.2025.2512080 · External reference
Comparative assessment of the stability of AHP and FAHP methods
10.3390/sym13030479 · 2021 · External reference
Sensitivity analysis approaches in multi-criteria decision analysis: a systematic review
10.1016/j.asoc.2023.110915 · 2023 · External reference
A novel fuzzy neural network approach with triangular fuzzy information for the selection of logistics service providers
10.1007/s10462-025-11209-7 · 2025 · External reference
On the extent analysis method for fuzzy AHP and its applications
10.1016/j.ejor.2007.01.050 · 2008 · External reference
Evaluating the critical safety factors causing accidents in downstream oil and gas construction projects in Malaysia
10.1016/j.asej.2023.102300 · 2024 · External reference
Analyzing the past to prepare for the future: writing a literature review
10.2307/4132319 · 2002 · External reference
Fuzzy AHP approach for enhancing excavation support system selection in building projects: balancing safety and cost-effectiveness
10.3390/buildings15091580 · 2025 · External reference
Content validity and its estimation
10.22037/jme.v3i1.870 · 2003 · External reference
Factors affecting delays in oil and gas construction projects
10.1038/s41598-025-31645-3 · 2025 · External reference
Using expertsopinions through Delphi technique
10.7275/rrph-t210 · 2007 · External reference
Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China
10.1061/(asce)0733-9364(2007)133:10(771) · 2007 · External reference
Risk management of green building development: an application of a hybrid machine learning approach towards sustainability
10.3390/su17146373 · 2025 · External reference