Abstract
Contact and support
Need help, have a question, or want to contact the ResearchHub team?
© 2026 ResearchHub. Built for responsible scholarly connection.
Pravin K. Johri
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
unpaywall
Confidence 95%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
Determining the Number of Kanbans in a Multiproduct, Multistage Production System
10.1080/00207549108930108 · 1991
Unresolved referenced work
1983
Modeling and Analysis of Production Line With Finite Buffers and Machines Subject to Breakdown
1985
A Linear Programming Approach to Capacity Estimation of Automated Production Lines With Finite Buffers
10.1080/00207548708919881 · 1987
Iterative Algorithms for Estimating the Capacity of Automated Production Lines With Finite Buffers
10.1080/00207548908942576 · 1989
A Heuristic Algorithm for Loading New Work on Circuit Pack Assembly Lines
10.1080/00207549008942840 · 1990
Heuristic Methods for Flexible Flow Line Scheduling
10.1016/0278-6125(87)90006-9 · 1987
Analysis Modelling and Design of Modern Production Systems
1989
Scheduling Algorithms for Flexible Flow Lines
10.1147/rd.294.0401 · 1985
An Adaptable Scheduling Algorithm for Flexible Flow Lines
10.1287/opre.36.3.445 · 1988
Design and Scheduling of Flexible Assembly Systems for Large Products: A Simulation Study
10.1016/0278-6125(91)90047-6 · 1991
No additional external references are available.