Abstract
Håkan Schunnesson
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
openalex
Confidence 95%
unpaywall
Confidence 95%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
Instrumented horizontal drilling for tunnelling site investigations
1984
Technical description of rock cores for engineering purposes
1963
Partial Least-Squares regression: a tutorial
10.1016/0003-2670(86)80028-9 · 1986
Current status and future trends of monitoring technology for drills
1993
Recording drilling parameters in ground engineering
1985
Drill process monitoring in percussive drilling -A multivariate approach to data analysis
1990
Drill monitoring for fault characterization -Field test in Zinkgruvan Zinc mine
1992
A technique for ground characterization using automated production drill monitoring
1987
Principal Component Analysis
10.1016/0169-7439(87)80084-9 · 1987
No additional external references are available.