On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization
10.1023/b:jims.0000018029.60981.e6 · 2004
On the minimization of total weighted flow time with identical and uniform parallel machines
10.1016/s0377-2217(97)00427-x · 1999
An improved algorithm for scheduling jobs on identical machines
10.1080/05695557708975117 · 1977
Scheduling identical parallel machines to minimize the total weighted completion time
10.1016/0166-218x(92)00176-m · 1994
Scheduling of a single machine to minimize total weighted completion time subject to release dates
10.1002/nav.3800290114 · 1982
Scheduling independent tasks to reduce mean finishing time
1974
10.1109/cim.1990.128164
10.1109/cim.1990.128164
A branch-and-bound algorithm to minimize total flow time with unequal release dates
10.1002/1520-6750(199210)39:6<859::aid-nav3220390610>3.0.co;2-w · 1992
Efficient heuristics to minimize total flow time with release dates
10.1016/0167-6377(92)90092-h · 1992
Scheduling jobs on a number of identical machines
10.1080/05695557408974926 · 1974
Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimization
10.1016/s0377-2217(01)00278-8 · 2002
Four simple heuristics for scheduling a flow-shop
10.1080/00207547808930015 · 1978
Scheduling maintenance and semi resumable jobs on a single machine
10.1002/(sici)1520-6750(199910)46:7<845::aid-nav6>3.0.co;2-# · 1999
An algorithm for single machine sequencing with release dates to minimize total weighted completion time
10.1016/0166-218x(83)90019-7 · 1981
Scheduling jobs and maintenance activities on parallel machines
10.1002/(sici)1520-6750(200003)47:2<145::aid-nav5>3.0.co;2-3 · 2000
Complexity of machine scheduling problems
10.1016/s0167-5060(08)70743-x · 1977
Scheduling the maintenance on a single machine
10.1057/palgrave.jors.2600791 · 1999
Formulation and heuristics for scheduling in a kanban flow-shop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers
10.1080/002075499191445 · 1999
An efficient heuristic in a flow-shop to minimize the total weighted flowtime of jobs
10.1016/s0377-2217(96)00273-1 · 1997
A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs
10.1016/s0360-8352(97)00093-4 · 1997
Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flowtime and weighted tardiness of jobs
10.1016/s0360-8352(00)00003-6 · 1999
Unresolved referenced work
Kept as external metadata until matched
An improved branching scheme for the branch and bound procedure of scheduling n jobs on m parallel machines to minimize total weighted flowtime
10.1080/00207548808947934 · 1988
Heuristics for scheduling in kanban system with dual blocking mechanisms
10.1016/s0377-2217(96)00276-7 · 1997
Weighted flow time bounds for scheduling identical processors
10.1016/0377-2217(93)e0142-k · 1995
A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems
10.1016/0377-2217(93)90244-h · 1993
Integrating maintenance and production decision in a hierarchical production planning
10.1016/s0305-0548(99)00022-2 · 1999
No additional external references are available.