Abstract
Rights: UNKNOWN · https://www.elsevier.com/tdm/userlicense/1.0/ · Source: journal-auto-sync:external:CROSSREF_ISSN
Mohanad Abdulazeez Abdulraheem Alfellag
Abstract
Rights: UNKNOWN · https://www.elsevier.com/tdm/userlicense/1.0/ · Source: journal-auto-sync:external:CROSSREF_ISSN
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
unpaywall
Confidence 95%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
Unresolved referenced work
2012
Unresolved referenced work
2006
Unresolved referenced work
2011
Unresolved referenced work
2009
Unresolved referenced work
2009
Thermal analysis of opencycle regenerator gas turbine power plant
2010
Study on the effective parameter of gas turbine model with intercooled compression process
2010
Performance analysis for an irreversible variable temperature heat reservoir closed intercooled regenerated Brayton cycle
10.1016/s0196-8904(03)00046-3 · 2003
Power optimization of an irreversible closed intercooled regenerated brayton cycle coupled to variable-temperature heat reservoirs
10.1016/j.applthermaleng.2004.08.013 · 2005
Recuperative solar-driven multi- step gas turbine power plants
10.1016/j.enconman.2012.11.006 · 2013
Thermal analysis of a gas turbine power plant to improve performce efficiency
2013
Closed intercooled regenerator Brayton-cycle with constant-temperature heat-reservoirs
10.1016/s0306-2619(03)00154-5 · 2004
Energy and exergy analysis of intercooled combustion-turbine based combined cycle power plant
10.1016/j.energy.2013.06.051 · 2013
Thermodynamic analysis and parametric study of an irreversibleregenerative-intercooled-reheat Brayton cycle
10.1016/j.ijthermalsci.2005.10.011 · 2006
Analysis of a Combined Regenerative and Reheat Gas Turbine Cycle using MATLAB
2014
Thermal performance of reheat, regenerative, inter-cooled gas turbine cycle
2015
Parametric Performance of Gas Turbine Power Plant with Effect Intercooler
2011
Analysis of a regenerative gas turbine cycle for performance evaluation
2014
Unresolved referenced work
2003
No additional external references are available.