Abstract
Peinan Li, Shengyu Jin, Yixin Zhai
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
unpaywall
Confidence 95%
doaj
Confidence 92%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
Two-phase material point method applied to the study of cone penetration
10.1016/j.compgeo.2016.03.003 · 2016
Simulation analysis of pipe jacking construction based on material point method
2019
Long rectangular box jacking project: A case study
10.1016/j.undsp.2019.08.003 · 2021
Assessment of non-linear rock strength parameters for the estimation of pipe-jacking forces. Part 2. Numerical modeling
10.1016/j.enggeo.2019.105405 · 2020
Analysis and application of friction calculation model for long-distance rock pipe jacking engineering
10.1016/j.tust.2021.104063 · 2021
Application of a coupled Eulerian–Lagrangian approach on pile installation problems under partially drained conditions
10.1016/j.compgeo.2014.10.006 · 2015
Analysis of jacking forces during pipe jacking in granular materials using particle methods
10.1016/j.undsp.2019.03.002 · 2019
From time capsules to networks: New light on Roman shipwrecks in the maritime economy
10.3764/aja.121.4.0595 · 2017
Analytical solutions of limit support pressure and vertical earth pressure on cutting face for tunnels
10.1016/j.undsp.2023.02.004 · 2023
Pipe-Ground Interaction During Curved Pipe Jacking Process with a Small Radius of Vertical Curvature
2023
Discussion on the theoretical formula for the pipe wall friction resistance in rectangular pipe jacking
2017
Study on law and distribution characteristics of ground settlement caused by construction of shallow-overburden rectangular pipe jacking
2020
The coupled eulerian-lagrangian analysis of pile jacking process in saturated soft clay by using modified cam-clay model
2017
Arbitrary Lagrangian–Eulerian method for dynamic analysis of geotechnical problems
10.1016/j.compgeo.2008.11.001 · 2009
Interpretation of pipe-jacking and lubrication records for drives in silty soil
10.1016/j.undsp.2019.04.001 · 2020
Ground response to multiple parallel microtunneling operations in cemented silty clay and sand
10.1061/(asce)gt.1943-5606.0001441 · 2016
Stack pipe model for pipe jacking method
10.1061/(asce)co.1943-7862.0000172 · 2010
Calculation of jacking force of rectangular pipe jacking considering thixotropy of mud
2022
Research on the performance of thixotropic mud and drag reduction technology in pipe jacking tunnel engineering
2016
Dynamic collapse characteristics of the tunnel face induced by the shutdown of earth pressure balance shields (EPB): A 3D material point method study
10.1016/j.undsp.2023.11.001 · 2024
A case study of magnetic survey and evaluation of wooden wrecks
2018
Formulae of lateral friction resistance for pipe-jacking considering different forms of mud screen
2014
Study on calculating methods of soil vertical deformation induced by pipe jacking construction
2007
Frictional analysis of pipe-slurry-soil interaction and jacking force prediction of rectangular pipe jacking
10.1080/19648189.2018.1425156 · 2020
A jacking force study based on interpretation of box jacking records: A case study of curved rectangular box jacking in soft soil in Saitama
2023
Reduced-scale model tests on the curved pipe basing wreck salvage method
2022
A jacking force study of curved steel pipe roof in Gongbei tunnel: Calculation review and monitoring data analysis
10.1016/j.tust.2017.12.016 · 2018
Numerical model for jacking force based on pipe–soil contact characteristics
2017
A reduced⁃scale model test of “Yangtze Estuary II” ancient shipwreck salvage using curved piping jacking basing method
2022
The theoretical analysis of calculation for jacking forces in pipe-jacking under the condition of mudstone
2006
Material point method simulation of hydro-mechanical behaviour in two-phase porous geomaterials: A state-of-the-art review
10.1016/j.jrmge.2023.05.006 · 2024
Novel wreck salvaging method using curved rectangular pipe basing method: A case study of “Yangtze River Estuary II” ancient shipwreck salvage project
10.1016/j.undsp.2023.11.016 · 2024
No additional external references are available.