Abstract
Contact and support
Need help, have a question, or want to contact the ResearchHub team?
© 2026 ResearchHub. Built for responsible scholarly connection.
D.R.S. van Hasselt, V. Hentschel, M. Hutteman, FJ Kaalberg, J.C.G. van Liebergen, H Netzel, A.J.M. Snel, Teunissen E.A.H., Jeff Wit
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
No local reference links have been materialized yet.
No local citing links have been materialized yet.
Monitoring Pilot Projects Using Bored Tunnelling: the Second Heinenoord Tunnel and the Botlek Rail Tunnel
10.1016/s0886-7798(99)00025-5 · 1999
3D-Geotechnical Model for the North/South Metroline in Amsterdam
1988
Tunnelling in Soft Soil with a High Water Level and Piled Foundations-Towards the Development of a Settlement Orientated and Settlement Minimising TBM control
1999
Settlement Risk Management with GIS for the North/South Metroline
1999
Numerical risk assessment studies for masonry structures due to TBM tunnelling in Amsterdam
1999
Unresolved referenced work
1999
Risk Management in the Amsterdam North/South Metroline, a matter of process-communication in stead of calculation
1999
Safety and security in the Amsterdam North/South Metroline
1998
Full scale injection test Amsterdam: results Stage 1 and 2
1999
Pile and surface settlements at full scale tests North/South Metroline Amsterdam
1998
Provenance
crossref
Confidence 100%
openalex
Confidence 95%
unpaywall
Confidence 95%
datacite
Confidence 0%
Design for deep underground stations on the North/South line
1998
No additional external references are available.