Abstract
Peter Butala, Alojzij Sluga
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
unpaywall
Confidence 95%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
Unresolved referenced work
1993
10.1016/b978-0-444-89465-6.50078-8
10.1016/b978-0-444-89465-6.50078-8
Unresolved referenced work
Kept as external metadata until matched
Unresolved referenced work
Kept as external metadata until matched
Bidding-based process planning and scheduling in a multi-agent system
10.1016/s0360-8352(96)00056-3 · 1997
A market approach to Holonic manufacturing
10.1016/s0007-8506(07)63096-0 · 1996
Interactive manufacturing: human aspects for biological manufacturing systems
10.1016/s0007-8506(07)62858-3 · 1998
Unresolved referenced work
Kept as external metadata until matched
Unresolved referenced work
Kept as external metadata until matched
Structural and operational complexity of future manufacturing systems
1998
Manufacturing on demand in production networks
10.1016/s0007-8506(07)60836-1 · 1997
Structuring of the information system for distributed manufacturing
1998
Complexity in manufacturing systems
1995
A multi-agent approach to process planning and fabrication in a distributed manufacturing
10.1016/s0360-8352(98)00132-6 · 1998
Negotiation as a metaphor for distributed problem solving
10.1016/0004-3702(83)90015-2 · 1983
No additional external references are available.