Abstract
Amir Hossein Eslami Khouzani, Amir Golroo, Morteza Bagheri
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
unpaywall
Confidence 95%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
10.1061/(asce)te.1943-5436.0000206
10.1061/(asce)te.1943-5436.0000206
10.1016/j.retrec.2012.03.011
10.1016/j.retrec.2012.03.011
10.1061/(asce)te.1943-5436.0000575
10.1061/(asce)te.1943-5436.0000575
10.1061/41123(383)112
10.1061/41123(383)112
Objective track quality indices
10.3141/1863-11 · 2004
Unresolved referenced work
2001
Unresolved referenced work
Kept as external metadata until matched
10.1080/15732479.2012.757791
10.1080/15732479.2012.757791
10.1061/41127(382)158
10.1061/41127(382)158
Unresolved referenced work
2015
Maintenance management of railway infrastructures based on reliability analysis
10.1016/j.ress.2012.03.017 · 2012
Unresolved referenced work
2005
Unresolved referenced work
Kept as external metadata until matched
Stochastic model for the geometrical rail track degradation process in the Portuguese railway northern line
10.1016/j.ress.2013.02.010 · 2013
Analysis on development of track irregularities with linear forecast model
2005
10.1002/qre.1381
10.1002/qre.1381
No additional external references are available.