Abstract
Contact and support
Need help, have a question, or want to contact the ResearchHub team?
© 2026 ResearchHub. Built for responsible scholarly connection.
Baoshan Huang
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
unpaywall
Confidence 95%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
Unresolved referenced work
Kept as external metadata until matched
10.1061/(asce)0733-947x(2002)128:6(542)
10.1061/(asce)0733-947x(2002)128:6(542)
Development of roughness prediction models for low-volume road networks in northeast Brazil
10.3141/2205-25 · 2011
Unresolved referenced work
Kept as external metadata until matched
Case study: Performance effectiveness and cost-benefit analyses of open-graded friction course pavements in Tennessee
2016
Unresolved referenced work
Kept as external metadata until matched
Evaluation of effectiveness and cost-effectiveness of asphalt pavement rehabilitations utilizing LTPP data
10.1061/(asce)te.1943-5436.0000378 · 2012
Cost-effectiveness analyses of maintenance treatments for low- and moderate-traffic asphalt pavements in Tennessee
10.1061/(asce)te.1943-5436.0000556 · 2013
10.1061/(asce)te.1943-5436.0000738
10.1061/(asce)te.1943-5436.0000738
10.3141/1680-03
10.3141/1680-03
Unresolved referenced work
Kept as external metadata until matched
Unresolved referenced work
Kept as external metadata until matched
Unresolved referenced work
Kept as external metadata until matched
Unresolved referenced work
Kept as external metadata until matched
Effectiveness analyses of flexible pavement preventive maintenance treatments with LTPP SPS-3 experiment data
10.1061/(asce)te.1943-5436.0000818 · 2016
Estimating optimum timing for preventive maintenance treatment to mitigate pavement roughness
10.3141/2235-06 · 2011
Estimating optimum timings for treatments on flexible pavements with surface rutting
10.1061/(asce)te.1943-5436.0000525 · 2013
10.3141/2235-08
10.3141/2235-08
10.3141/1823-06
10.3141/1823-06
Unresolved referenced work
Kept as external metadata until matched
10.3141/2180-07
10.3141/2180-07
10.1061/(asce)te.1943-5436.0000198
10.1061/(asce)te.1943-5436.0000198
10.3141/1940-01
10.3141/1940-01
Effectiveness of microsurfacing treatments
10.1061/(asce)0733-947x(2007)133:5(298) · 2007
10.1061/(asce)0733-947x(2003)129:6(673)
10.1061/(asce)0733-947x(2003)129:6(673)
10.1061/(asce)0733-947x(2004)130:1(14)
10.1061/(asce)0733-947x(2004)130:1(14)
10.1061/(asce)0733-947x(2005)131:10(744)
10.1061/(asce)0733-947x(2005)131:10(744)
Part 3: Managing and evaluating pavement efforts: The highway development and management system in Washington State: Calibration and application for the department of transportation road network
10.1177/0361198105193300107 · 2005
Matter element analysis for optimal timing and preventive maintenance of pavements
10.3141/2150-03 · 2010
Pavement treatment short-term effectiveness in IRI change using long-term pavement program data
10.1061/(asce)te.1943-5436.0000446 · 2012
10.1080/10298436.2014.893318
10.1080/10298436.2014.893318
Unresolved referenced work
Kept as external metadata until matched
Unresolved referenced work
Kept as external metadata until matched
10.3141/1524-13
10.3141/1524-13
10.3141/1860-21
10.3141/1860-21
Unresolved referenced work
2013
Costs and effectiveness of flexible pavement treatments: Experience and evidence
10.1061/(asce)cf.1943-5509.0000253 · 2012
Unresolved referenced work
Kept as external metadata until matched
No additional external references are available.