Abstract
K. Jiang, L.D. Seneviratne, S.W.E. Earles
Abstract
Authors
Institutions
No ROR-resolved institution is linked to this work yet.
Provenance
crossref
Confidence 100%
unpaywall
Confidence 95%
datacite
Confidence 0%
No local reference links have been materialized yet.
No local citing links have been materialized yet.
The scheduling-sequence problem
10.1287/opre.7.5.621 · 1957
Outline of an algorithm for integer solutions to linear-programs
10.1090/s0002-9904-1958-10224-4 · 1958
The multiple-robot assembly plan problem
10.1007/bf01258212 · 1993
Unresolved referenced work
1982
Machine sequencing via disjunctive graphs: an implicit enumeration algorithm
10.1287/opre.17.6.941 · 1969
Scheduling the general job shop
10.1287/mnsc.31.5.594 · 1985
Connectionist ideas and algorithms
10.1145/92755.92764 · 1990
Unresolved referenced work
1989
An integer linear-programming model for machine scheduling
10.1002/nav.3800060205 · 1959
Tabu search techniques
10.1007/bf01720782 · 1989
Job shop scheduling with genetic algorithms
1985
Using genetic algorithms to schedule flow shop releases
1989
Collision-free motion planning of two robots
10.1109/tsmc.1987.289330 · 1987
A survey of constraint based scheduling systems using an artificial intelligence approach
10.1016/0954-1810(91)90001-5 · 1991
Unresolved referenced work
1990
“Neural” computation of secessions in optimization problems
10.1007/bf00339943 · 1985
Unresolved referenced work
1964
Unresolved referenced work
1991
Resurrecting the future of operation research
10.1057/jors.1979.41 · 1979
Intelligent scheduling in manufacturing through neural network and expert systems
1990
Constraint propagation in planning and scheduling
1991
Constraint satisfaction algorithms
10.1111/j.1467-8640.1989.tb00328.x · 1989
A two-robot printed circuit board assembly system
10.1080/09511929508944626 · 1995
Job shop scheduling by science annealing
1988
No additional external references are available.